Midgley - beyond Chapel Lane
A calm, very warm day for Ray and Frank H to continue the widening, revetment construction and step building on the path that leads up towards Churn Milk Joan.
1. Steps.
| Stob being hammered into position |
![]() |
| Group of three steps neatly in place. |
2 Widening and revetment.
![]() |
| End point of the day and down-slope view of revetment and widened path. |
| End point of the day and up-slope view of revetment and widened path |
Meanwhile back at the toolbag . . .
| Not the new CROWS logo but a Common Lizard basking in the sun |
. . . and lucky lizard! No basking for Ray and Frank who put in a strenuous shift of carrying, digging. scraping, levelling, barring, hammering, drilling, packing and landscaping. Phew!
This stretch of path is much improved with the precarious sections now being safe. There is still more that could be done . . . when funding allows! Today's work, however, was possible because of a donation from Little Box Consulting. Many thanks.