Wednesday 20 November 2013

Redman Dam steps


You start with a steep muddy hillside


You dig out a level area into the banking


This can be quite deep in places


On the level ground parallel boards are staked and set


Steps are placed at suitable positions


These are pegged and the steps filled with the soil previously removed for levelling


The single steps become a staircase