Friday 22 November 2013

Two jobs alongside Hebden Water

Redman Dam steps
The basic steps for the first flight is all but finished. A few more steps to put in down to the bridge and a handrail to install. Looking good!


 View from the riverside

Path alongside Hebden Water to the archery field

This path is very well used but parts are very muddy and with vegetation overhanging the path. Now all cleared with drains cut in, so should stay clear for some time.


Scraping back the path with azads 
(and discovering a good surface underneath)