Monday 15 January 2024

HUBBERTON ABOVE TRIANGLE

 On a beautiful but cold day Linda and Ginny went to do drainage work on a bridleway between Toothill Lane and Kennel Lane.  The ground and the water were both frozen so we settled for cutting back brambles and overhanging branches.   We then moved up to another bridleway between Toothill Lane and Redbrink Lane, where horses would have had quite a struggle to get through.


Linda cutting back brambles which are already sprouting!


Ginny tackling a laurel bush which covered half of the track.

The work was funded by donations to CROWS for which many thanks.