Monday, 3 October 2022

MYTHOLM - path behind Glen View

 Heidi, Neil D and Rich went to replace some slats on a bridge that had been reported.

The path is used as a route to the school so we needed to do the work with some urgency.


Post down at the start of the path (now re-erected)

A very scary bridge!!

When we removed some old slats, we found that the main stringers had also deteriorated, so it ended up as a rebuild but a shorter bridge. After a dash back to the depot to get a replacement stringer we set to work.

Building the footings

It's all level!

Once the frame was secured, just needed to nail in the slats, add staples and level the path either end.

Slats all in place

A great improvement

This took job longer than expected so we will need to go back and do cutting back, replacing steps and path levelling. 

The work was funded by Blackshaw Parish Council.