Monday 17 January 2022

PENNINE WAY AT COLDEN

 Neil, Billie and Rich completed of the work on the Pennine Way off Edge Lane.

Before Xmas we worked on the drainage on this path and it seems to be working well. The task today was path widening and cutting back and laying aggregate to cover the drainage pipe. 

Apart from being unsightly, the pipe is in danger of being damaged

Cross-pieces put in to prevent the aggregate being washed out

1 tonne of gravel to load and deliver down the path

work in progress

Path widened and aggregate all laid

Flags uncovered at the top

Work funded by Natural England and Calderdale Highways