Neil, Billie and Rich completed of the work on the Pennine Way off Edge Lane.
Before Xmas we worked on the drainage on this path and it seems to be working well. The task today was path widening and cutting back and laying aggregate to cover the drainage pipe.
|
Apart from being unsightly, the pipe is in danger of being damaged
|
|
Cross-pieces put in to prevent the aggregate being washed out
|
|
1 tonne of gravel to load and deliver down the path
|
|
work in progress
|
|
Path widened and aggregate all laid
|
|
Flags uncovered at the top
|
Work funded by Natural England and Calderdale Highways