Friday, 11 January 2019

CORNHOLME

One team out today working in the Cornholme area on path 086!

Tristan and Ken installed steps up to a paved path that they had uncovered.


One wooden step and one stone step in place.




Flight of steps in progress.
A path was then cut into the hillside to lead up to the paved path.


Top of wooden steps with path leading on to the paved section.



Paved path leading up to where Ian and Frank S
were installing more steps.

The work was funded by the proceeds of the local Xmas wreath making event and by a local donation.