Friday, 11 May 2018

CRAGG VALE

On Friday 11th May Frank S, Gerald and Ian repaired two foot bridges near New Bridge in Cragg Vale and then started to carry out some drainage work at Wood Top in Cragg Vale.

Short foot bridge with missing slats

Rotten slats

 Five new slats installed to make the footbridge safe again

Wobbly hand hold at top of steps leading down to the bridge

Strengthened hand hold - now secure

Long bridge with several rotten slats
Seven new slats installed


Drainage work in the path near Wood Top, Cragg Vale