Today's team Frank ,Dick, Stella, Paul, Fred, Dave, Richard J and Graham worked on path clearance near East Lee Lane and Pex Tenements.
Before and after pictures of path clearance at the top of East Lee lane
Branches dumped on path causing blockage. |
Long grass and rushes needed strimming. |
Strim to clear ditch crossing and stile. |
Much clearer. |
The path lower down the hill needed attention. |
Hard at work. |
Making a by-pass around tree next to the stream. |
Overgrown path with bramble. |
Looking better. |
Path easier to use, if a little wet. |
Overgrown Path |
Overgrown path next to house. |
After clearance |
Before and after pictures of path clearance at the top of East Lee lane