Friday, 26 May 2017

RIPPONDEN

Two work parties out today in the Ripponden area. Nigel and Gerald did some mud scraping and laid small flagstones at a muddy part of the riverside path where part of the path has dropped away into the river.


Riverside path before work


Riverside path after mud was scraped and flagstones were laid


Later (with Eleanor) we dug some drainage channels at the side of Quaker Lane. The test of their success will be after it rains!

Meanwhile Ruth, Lynda and Ginny did some cutting back on Folly Lane and balsam bashing along the river.