Team was Stuart, Stella, Sam, Richard J, Frank, Paul, Dave, Fred and Richard P
Putting in assembled boardwalks
Two 10fts and one 30ft have gone in
Put in marker post to indicate which side of the wall people should walk on.
Also looked at the drainage, digging out old channels and drains under the wall.
Putting in assembled boardwalks
Two 10fts and one 30ft have gone in
Put in marker post to indicate which side of the wall people should walk on.
| Bit grubby, but should do the trick! |