Richard and Stella walked out the whole e-Trail and way-marked it, checking what work needs to be done.
Frank and Bernard worked on a stile and some drains nearby.
Repaired stile
Side drain down to stile
Dick and Rich put in several grips and turnbys on the path up to the barrel bridge. It should take a lot of the water off the surface which is currently very squishy.
Underneath the mud was a good surface so we widened it all the way down
3 of the many grips put in to take the water off
Side drain and turnby at the bottom
Turnby across the whole width, already flowing nicely before we left
PS Blue sky, no rain!