RAILWAY LINE AT RIPPONDEN
From the Ripponden end, there has been effective
clearing in the past and the old railway track looks fine (and
demonstrates the effectiveness of a blitz on a defined area) but there's
a clear line where that stops and an isolated patch of thick balsam,
followed by another cleared patch (and masses of balsam after that). So
we worked on the isolated patch. Two people are going back to finish it off for a couple of hours next week.
REDMAN DAM (HEBDEN BRIDGE)
This is what the hillside looked like to start with
By lunchtime we had cut a swathe through the balsam
To break the boredom we made a 'balsam' circle
The area we had cleared during the session (4 people x 3.5 hours)