In the lee of Lee Wood
On a day when a variety of thundery, showery conditions was threatened Stella and Frank, in the shelter of Lee Wood just above the Bowling Green alongside Hebden Water (see map), worked in calm conditions to make safe a flight of steps.
 |
| 1. Worksite: marked with blue index. |
The flight of steps, which negotiated a steep bank, was in poor condition because of: rampant overgrowth, missing risers, detached side-rail, eroded tread areas and a badly supported end rail.
 |
2. Lower end of steps: End rail is weakly supported, a riser is missing and the side revetment is not actually attached! |
 |
3. Upper end of steps: Eroded tread areas, detached side revetment and missing riser. |
 |
4. Work in progress: Side revetment now secure and two risers are in place. |
The new risers had to fit into the original structure, a factor that limited where the stobs could be placed. The ground was exceptionally hard but a combination of long bar, heavy lump hammer and muscular grunt saw the risers installed.
This path is very popular, especially with dogs taking their owners for a walk. We received a lot of thanks from the owners for making these steps secure and safe. The dogs seemed pleased too . . . but the sight of our lunchtime sandwiches might have had something to do with that!
In the rampant path-side overgrowth an elusive Wren (one of Britain's smallest birds) fled to safety. It was tricky to spot but looked like this . . .
 |
5. The Wren (Troglodytidae:Troglodytes troglodytes) the name's almost as long as the bird!
|
 |
| 6. Packing and levelling; |
In the afternoon we inserted a bracing section of lower revetment, filled and graded the tread areas, hammered-in stobs to support the weak end rail, widened the path where it met a side-inlet and expended a disproportionate amount of energy to install a final riser. Phew! Some muscles may ache tomorrow!
Today's work was funded by general donations to CROWS. Many thanks for your support to help us keep open this footpath (Heptonstall 053).
 |
| 7. End section; Everything braced and secured. |
 |
8. Mid and upper sections overview: Now safe and easier to negotiate. |
It's always tricky carrying out repairs to an existing structure - new sections have to be tweaked and compromises are inevitable. Attempting a full reconstruction would have been problematic - the rocks supporting the lower end of these steps have settled into a state of interlocked stability. Disturbing this might be catastrophic . . . and there is no alternative route up through this 'hangra' (Old English for wooded slope).
More next week . . if we can straighten up!