Saturday, 26 September 2026

RYBURN - Crow Hill Bridleway

A crisp early autumn day saw two teams out from Ryburn to work on two sections of a bridleway which crosses Crow Hill.

Location of work

Linda and Jak went to the southern section of the bridleway to cut back overhanging and underfoot foliage and waymark the route.

Before

After

Linda with a new waymark

Linda and Jak rejoined the team of Carla, a new volunteer, Jerry and Rich at the other end of the bridleway where they were working on a stile rebuild.

Stile needing some TLC

At first only one of the team was visible and there was some idle chat about the other two being in a hole. This turned out to be indeed true! The rebuild involved taking out some very large posts which had been deeply pile driven into the ground making for very hard work in the efforts to remove them. Fortunately the steps across the stile were sound and did not have to be removed.

Bye bye spade!

Carla getting stuck in!

After a considerable time and a long way down, the post was removed.

Rich with part of the post

Eventually the stile was constructed without too much further trouble.

Jerry next to the steps

Stile now taking shape


Carla testing the new stile


A group of CROWS in action

This work was funded by Calderdale Highways with thanks to them.