HEBDEN BRIDGE - 2 jobs today completed by Andy, Kris and new volunteer Chloe on her first day out with CROWS.
Our first job was adding 3 steps to a slippery slope in Dodd Naze. These fitted between some stone steps we discovered while digging out for the new steps.
The second job was some cutting back and stile repair in Machpelah (on the Burnley Road between Hebden Bridge and Mytholmroyd). We replaced the broken bottom treadboard and added an extra step to make it easier to get onto the stile.




