Ginny and Rich carried out several small jobs on this path which is a well used route connecting the estate with the rail and bus services. The jobs included:
- Cleaning off the bridge to identify slats that need replacing
- Securing the path edge at the Junction
- Cutting back encroaching brambles and tree saplings
- Clearing the stone steps
All the jobs were completed, but we need to return to replace three slats on the bridge, brush cut more brambles, add three steps down to the bridge and improve the stone steps.
