Sunday, 1 March 2026

NEW WORK Blackshaw Head

 Mo and Ginny went to survey routes in Blackshaw Head that had been marked on the Cams map as having problems.  As the Cams survey had been done several years ago and at a different season some of the problems had been resolved and others had appeared, but on this route most of them were still very apparent.  We started at Badger Lane where a stile was almost impossible to cross and needs technical advice about the best way to approach repairs.



                        Moving on there is a footpath which is very difficult to use at present.
           

And another one which will be a lovely walk when it has been levelled out and the brambles cut back.


Finally back to impossible stiles.  A series of job sheets are on their way!