Bernard, Richard J and Rich worked on Trimmer Lane which had been reported to Calderdale Highways, who passed on the work to us.
The Bridleway was quite overgrown and the side drain which was covered in vegetation was overflowing in places.
|
The hidden drain |
|
The overgrown track |
In order to find out what the state of the drain was, we had to strim all the undergrowth off.
Once we could see the drain we set about clearing it out of all the vegetation and silt.
|
A stretch of drain working well |
|
The drain and strimmed path |
|
We managed to do about a third of the length, so will have to return.