Four teams today:
- Ginny and Richard J painted the Trig point at Nab Hill
- Dick and Frank cut up and pre-drilled all the timber for next weeks boardwalk job
- Graham, Bernard, Stuart, Paul and Ian worked on the Mill path in the Crags - drainage, clearing steps and cutting back. (see separate post)
- Rich and Stella fixed a bridge and some drainage in Crimsworth
Three replacement slats going in on the bridge in Dean Wood. |
Mulch cleared off the path and channel put in. |