Dick, Dave, Graham, Bernard, Gerald and Richard J.
Cleared the path from Paddy Bridge past the playing fields to Park Fold.
Over-growth and Bramble were cut back as was a Privet hedge that was narrowing the path width.
| Overgrown path. |
| Bramble cutting. |
| Dave strimming. |
| Cutting back the hedge. |
| Much easier to use. |
| Narrow path between two hedges needed cutting back. |
| Easier to use. |