A mixture of jobs, first replacing existing steps, cutting back, way-marking and tidying up a stile then on to the bigger jobs.
Fixing the water running over the muddy path by the bridge
by taking the water down a new channel into the clough.
Coming up from the clough, path widened and flattened
with overhead vegetation cut back
Three steps and some revetment to remove a difficult section of the path.
Narrow path widened by cutting back and fixing fence posts