Friday 1 August 2014

Foster Clough East of Hey Head

A mixture of jobs, first replacing existing steps, cutting back, way-marking and tidying up a stile then on to the bigger jobs.


Fixing the water running over the muddy path by the bridge 
by taking the water down a new channel into the clough.


Coming up from the clough, path widened and flattened 
with overhead vegetation cut back



Three steps and some revetment to remove a difficult section of the path.

Narrow path widened by cutting back and fixing fence posts