Another rain free day - miracles. Having uncovered the board-walk, the next job was to repair it and sort out all the drainage around it. Already seems to be working well.
Meanwhile everyone else dealt with all the mud on the path by scraping and putting in drains from the Hinchcliffe to the clapper bridge below Greenbank Terrace.
At the end of the day we decided we ought to have a group photo of the slightly mud spattered Cragg Vale gang.
The repaired board-walk
A newly cleared section of path