One team out today working in the Cornholme area on path 086!
Tristan and Ken installed steps up to a paved path that they had uncovered.
 |
One wooden step and one stone step in place. |
 |
Flight of steps in progress. |
A path was then cut into the hillside to lead up to the paved path.
 |
Top of wooden steps with path leading on to the paved section. |
Paved path leading up to where Ian and Frank S
were installing more steps.
The work was funded by the proceeds of the local Xmas wreath making event and by a local donation.